The full upstream README, mirrored here for reference. Install config, tool schemas, adoption signals, and an original overview live on the Behind the Watt listing page.
The open database of behind-the-meter data center power. Who's actually online, how fast they got there, and what their power really costs. Tracked daily. Sourced from air permits, not press releases.
site/ — Astro static build → behindthewatt.comengine/ — watchers → archive → LLM extraction → review → publishbehindthewatt/data (own repo)Pre-launch. Genesis dataset: 3 verified operating facilities, pilot of Jul 2026.